Traditional Method - ( sequential method - tendering process )
- Accelerated Method - negotiated tender
This method usually uses the standard form of contract by the joint Contract Tribunal ( JCT) or a smilar .
The contract requires the contractor to carry out the construction accroding to the drawings and specification drawn up by the design team .
All work is supervised on behalf of the client by the design team leader , which is normally the architect or on civil engineering projects , the consultant civil engineer .